Lovett construction nearing completion
By Taylor McKay Hathorn
A lengthy and extensive renovation project at Lovett Elementary School, the Clinton Public School District’s sixth-grade school, is on track to be completed early this summer, in plenty of time for the start of the upcoming 2021-2022 school year.

The expansion to the Clinton Public School District’s (CPSD) sixth-grade school includes four classrooms, two upstairs and two downstairs. According to CPSD Chief Information Officer Robert Chapman, Lovett presently divides its students into four “teams,” each with four teachers.
RELATED: Lovett names honor roll students for second quarter
This aspect of the construction, then, would allow the school to either reduce existing class sizes or to add another team without the addition of further temporary structures to the Northside Drive campus. At the present, there are two such structures on the campus of Lovett Elementary School, and the district plans to leave those in place to continue to house the ACCENT gifted program after the construction has been completed.
Two conference rooms will also be added to the school’s library/media center, a much-needed augmentation, as Lovett presently does not have a designated area for parent-teacher conferences, whether academic or behavioral.
“This addition will allow for that,” Chapman reflected.
Some of the improvements to the edifice are cosmetic, as the front of the school is receiving a “face lift” that includes a new canopy and a new entryway. These additions will further enhance the school’s existing safety precautions, as it will give visitors only one way into and out of the school.
Parents and visitors to the school will also appreciate the new “loop road,” which will allow traffic to come into the school off of Northside Drive via a double-lane driveway. Chapman noted that this road-expansion will increase student safety during drop-off and dismissal. The structure of both drop-off and dismissal will be similar to what is currently done at Northside and Eastside Elementary Schools, as parents who need to come inside the building will now have space to pull off to the side, while still allowing the flow of traffic to move around their parked vehicles. Afternoon car rider pickup lines, which currently line the shoulder of Northside Drive, will likely also use the loop road.
Like Sumner Hill Junior High School, which was extensively renovated nearly a decade ago, Lovett Elementary School was brought into the district as part of a consent decree in 1977, thus unifying what were, at the time, racially-segregated neighborhoods, allowing all students in the Clinton community to attend school together based on age rather than race.
RELATED: Clinton Community Nature Center to hold living history event in commemoration of Black History Month
For Chapman, the District’s attention to the school’s structural condition is a way of paying homage to Lovett’s long history with the district while still ensuring that the integrity of the structure is maintained.
“The construction is further evidence of the fact that [the District’s] investment into the community is ongoing. We are dedicated to keeping these schools running and up to code—not just by state standards, but by the standards of the Clinton Public Schools,” Chapman concluded.
